Curtain wall manufacturer provides a detailed and multi-step process that includes the design, material selection, fabrication, and assembly of curtain wall systems. These systems are non-load-bearing facades for buildings, typically composed of glass and aluminum or other materials, and serve as an aesthetic and functional element of a building’s exterior. Here’s a breakdown of the key stages involved in curtain wall manufacturing

1. Design and Engineering

The design phase begins with input from architects who specify the aesthetic, performance, and functional requirements of the curtain wall. The choice of materials, colors, and finishes is influenced by the building’s architectural style, location, and environmental considerations.

Engineers ensure the curtain wall system can withstand various forces like wind, seismic loads, thermal expansion, and moisture. Calculations are made for the overall structural integrity of the system, including the load-bearing capacity of the frame and the glass panels.

Curtain walls are designed to meet specific performance standards, such as energy efficiency, water and air tightness, sound insulation, and UV protection. These factors guide the choice of materials and design features.

2. Material Selection

The frame is typically made from lightweight and durable materials such as aluminum or steel. Aluminum is the most common due to its corrosion resistance, strength, and ease of fabrication. It is also available in various finishes like anodized, painted, or powder-coated.

The glass panels used in curtain walls can vary widely depending on performance needs. Types include:

  • Tempered Glass: Stronger and safer than regular glass, it is used in situations where safety is a concern.
  • Insulated Glass Units (IGUs): Composed of two or more panes of glass separated by an insulating spacer, providing better thermal insulation and energy efficiency.
  • Low-E Glass: Coated to reflect infrared and ultraviolet light, helping to maintain the internal temperature of the building.
  • Laminated Glass: Provides safety and sound insulation, often used in high-rise buildings.

Used to ensure a tight seal between the glass and the frame to prevent air and water infiltration. These materials are chosen based on weather resistance and long-term durability.

3. Fabrication Process

  • The raw materials (aluminum, glass, etc.) are cut and shaped according to the design specifications. The aluminum frame is extruded, cut into sections, and drilled to create precise holes for screws or bolts. The glass panels are cut to the required dimensions and treated if necessary (e.g., tempering or lamination).
  • The aluminum framing is assembled, with glass panels being placed into pre-designed slots or frames. The assembly may be done in sections or panels, especially in unitized curtain walls, which are pre-assembled in a factory and later installed as a single unit on-site.
  • he aluminum frames are welded or mechanically fastened together. Specialized machines are used for precise cutting and welding to ensure that the frames fit together seamlessly and can securely hold the glass panels.
  • A critical step in the fabrication process, high-performance sealants are applied between the frame and glass to ensure the curtain wall system is airtight and waterproof. Sealants also help to reduce thermal bridging and improve energy efficiency.

4. Testing and Quality Control

Each curtain wall system undergoes rigorous testing to ensure it meets structural integrity and performance standards. Tests typically include wind load testing, thermal expansion tests, and water resistance tests.

Performance tests evaluate key properties such as thermal insulation (U-value), sound transmission, air permeability, and water resistance. The systems are tested under various simulated environmental conditions to ensure they will perform as expected in real-world settings.

Each curtain wall panel is inspected for dimensional accuracy and overall aesthetic appearance. This includes checking for proper alignment, finish quality, and consistency.

5. Pre-Assembly and Packaging

  • In modern curtain wall manufacturing, much of the assembly is done in the factory to ensure quality control and minimize on-site installation time. Pre-assembly can include placing the glass into the frame, inserting sealants, and attaching other components like mullions and transoms.

Once the curtain wall systems are assembled, they are carefully packaged and protected for transport to the job site. Packaging ensures the glass panels and frame sections remain undamaged during transit.

Sustainability

Top Custom EAS Manufacturers to Consider

In summary, curtain wall manufacturing is a detailed process that combines advanced materials, precise engineering, and high-quality fabrication techniques to create durable, energy-efficient, and aesthetically pleasing building facades.

Experience and reputation

Look for a manufacturer with a proven track record in the industry. Check their portfolio of completed projects and client testimonials.

Comprehensive services

Ensure they offer a true one-stop solution, including design, engineering, fabrication, installation, and after-sales support.

Quality certifications

Verify that the manufacturer holds relevant industry certifications such as ISO 9001 for quality management.

Advanced technology

Look for manufacturers who prioritize energy-efficient designs and materials.

Custom capabilities

Ensure they can provide customized solutions to meet your specific project requirements.

Materials and finishes

Check the range of materials and finishes they offer, ensuring they meet your aesthetic and performance needs.

Energy efficiency

Look for manufacturers with a strong track record in producing high-quality books. Check reviews, testimonials, and portfolios to gauge their reliability and expertise.

Testing facilities

A top manufacturer should have in-house testing facilities to ensure product quality and performance.

Project management expertise

Verify their ability to manage complex projects efficiently and on schedule.

25+

Design Teams

100+

m'Showroom

200+

Skilled Workers

8,000,000+pieces

Monthly Capacity

6 Steps To Cooperation

01.

1. Project research

Project situation, project size, location

02.

2. Design & construction plan

Bill of Quantities, Project Drawings, Product Information Confirmation

03.

3. Scheme confirmation

Construction plan, budget evaluation and quotation

04.

4. Construction preparation

Technical support, survey and design, material ordering

05.

5. Construction & guidance

Send personnel to the site to support construction

06.

6. After-sale service

The goods are usually packaged and transported or delivered according to the client’s requirements.